thePropCheck AI property due diligence
Sign in

Brigade Citadel - Phase 3

Brigade Citadel - Phase 3 is a residential project by Brigade Enterprises Limited in Erragadda, Balanagar, Medchal-Malkajgiri district, Telangana. It is registered with the Telangana RERA as P02200002548 (status: New Project). The approving authority named in the filing is GHMC (plan approval . 1/C19/08901/2020). The promoter filed a total site area of 51,596 sq m (12.7 acres) and 2 buildings on the approved plan. The proposed date of completion is 31/12/2025.

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

Brigade Citadel Phase 3 is a residential apartment project recorded as a new project in the TG-RERA filing. The filing records 350 apartments across 2 towers, with 16 floors and a land area of 51,596.35 sq m; proposed completion is 31 December 2025.

Project type
Residential (apartment)RERA filing
Units
350RERA filing
Towers
2RERA filing
Floors
16RERA filing
Land area
51596.35 sq mRERA filing
Possession
31/12/2025RERA filing
Status
New ProjectRERA filing

Configurations & sizes

The project offers 2BHK and 3BHK configurations. Carpet areas were not measured from the approved drawings; the TG-RERA filing records 114 2BHK homes, 98 booked, with saleable area of 59.43 sq m, and 236 3BHK homes, 211 booked, with saleable area of 44.5 sq m.

TypeCarpetSaleableFacingSource
3BHK1,030 sqft44.5 sq mRERA filing
2BHK758 sqft59.43 sq mEastRERA filing
2 Bedrooms + 2 Toilets758 Sq.ft.1,177 Sq.ft.d1di04ifehjy6m.cloudfront
3 Bedrooms + 2 Toilets1,030 Sq.ft.1,583 Sq.ft.d1di04ifehjy6m.cloudfront

Amenities

The disclosed amenities include community and recreation spaces, fitness facilities, and landscaped areas.

98 amenities · 92 listed
  • Clubhouse · 53,000 SQ.FT.
  • Green Strip/TOT LOT/Park
  • Community Buildings
  • 24/7 security
  • power backup
  • cycling & jogging track
  • business center
  • party lawn
  • intercom
  • steam room
  • spa/sauna/steam
  • multipurpose room
  • senior citizen siteout
  • amphitheater
  • cricket pitch
  • fountains
  • mini theatre
  • business suites
  • medical store/pharmacy
  • car parking
  • jacuzzi
  • waiting lounge
  • sauna bath
  • grocery shop
  • vastu compliant
  • water storage
  • fire fighting system
  • closed car parking
  • gated community
  • entrance lobby
  • security cabin
  • lift(s)
  • aerobics room
  • yoga / meditation area
  • paved compound
  • conference room
  • farmers’ market
  • 53,000 sq.ft. clubhouse
  • clubhouse
  • Amphitheatre
  • Children's Play Area
  • Cricket Practice Net
  • Jogging Track
  • Outdoor Gym
  • Skating Rink
  • Aerobics
  • ATM
  • AV Room
  • Clinic
  • Convenience Store
  • Gym
  • Indoor Games
  • Party Hall
  • Multipurpose Hall
  • Pharmacy
  • Physiotherapy
  • Pool Table
  • Swimming Pool/ Kids Pool
  • Table Tennis
  • Banyan Tree - Seating Area
  • Seating Plaza
  • Play Lawn
  • Yoga and Meditation
  • Salon
  • Water feature
  • Multipurpose lawn
  • Amphitheatre + stage
  • Emergency driveway
  • Flea/farmers’ market
  • Feature wall
  • Terrace pool
  • Tot lot
  • Pool at the 2nd floor terrace
  • Jogging and Strolling Track
  • Swimming Pool
  • Lift
  • Park
  • Reserved Parking
  • Service/Goods Lift
  • Maintenance Staff
  • Banquet Hall
  • indoor recreation
  • multiple fitness amenities
  • landscaped gardens
  • open lawns
  • cricket practice nets
  • event facilities
  • communal areas
  • activity zones
  • Piped Gas
  • Waste Disposal
  • Cricket net practice
  • Event Space & Amphitheatre

Specifications

2 BHK
4 kW
3 BHK
6 kW
Basement Walls and Ceiling
Cement Paint
Bedroom Doors
Hardwood frame, masonite skin shutter finished with PU paint and architrave
Common area including lift lobby walls and ceiling
Emulsion Paint
Counter
Provision for Modular Kitchen
CP Fittings
Jaquar or equivalent
DG Backup
3 kW for 3 BHK, 2 kW for 2 BHK
Emergency power
100% backup for emergency power of lifts, pumps and lighting in common area
Exterior Finish
External texture paint in combination with external emulsion as per design.
Flooring
Anti-skid Ceramic Tiles
Living / Dining / Family / Foyer
Vitrified Tiles
Main Door
Teakwood frame, flush shutter with both side veneer with teak finish and architrave
Master Bedroom
Wood Finish Vitrified Tiles
Master Bedroom Toilet
Ceramic Tiles
Modular Switches
Anchor Roma or equivalent make
parking
1 covered parking space
Plumbing / Electrical
Plumbing point provision for water purifier/sink and washing machine; Electrical point provision for Water Purifier, Refrigerator,Microwave, Washing Machine, Instant Geyser, Hob, Chimney and Mixer
rooms
3 bedrooms, 3 bathrooms, 1 balcony
Sanitary Fixtures
Jaquar/Parryware or equivalent (Wall mounted EWC with concealed cistern)
Security System
Provision for intercom facility (Handset in customer scope)
Staircase, utility area and service area walls and ceiling
OBD
Toilet Doors
Hardwood frame, laminate finish shutter and architrave
Unit Ceiling
Acrylic Emulsion Paint
Vertical Transportation
Lifts provided as per design (OTIS/Fujitec/Schindler or equivalent)
Windows
UPVC/Aluminium with bug screen

Location & connectivity

The project is in Erragadda, Balanagar mandal, Medchal-Malkajgiri district, PIN 500018. Developer-listed nearby places include Erragadda Metro Station (0.2 km), Bharath Nagar Metro Station (0.5 km), a bus stop (0.2 km), Begumpet Railway Station (5 km), and Secunderabad Railway Station (10 km).

Erragadda, Balanagar, Medchal-Malkajgiri
📍 Open in Maps
Nearby
  • Erragadda Metro Station0.2 km
  • Bharath Nagar Metro Station0.5 km
  • Bus Stop0.2 km
  • Begumpet Railway Station5 km
  • Secunderabad Railway Station10 km

Promoter

The promoter is Brigade Enterprises Limited, a company with 7 other registered projects, and its official website is brigadegroup.com. The named architect is KAIVASAM PANDURANGA MURTHY and the named structural engineer is ANANDHI G.

Brigade Enterprises Limited
7 other projects on record
Official website ›Developer site

Additional details

Launched Aug 2020magicbricks
Approvals
Project Permit Number
2033/GHMC/SLP/2022-BP

Filed vs marketed

The TG-RERA filing records 350 units and 2 towers, while developer-site marketing shows 1,334 units and Magicbricks shows 9 towers; the filing gives the locality as ERRAGADDA, while the developer site lists a longer address in Sultan Bagh and Moti Nagar.

  • Total units: The developer’s site says 1334; the RERA filing says 350. Developer site
  • Towers: magicbricks says 9; the RERA filing says 2. magicbricks
  • Total units: magicbricks says 1124; we show 1334. magicbricks
  • Locality: The developer’s site says Survey No :78 & 79, Meter Factory, Ashok Marg, Sultan Bagh, Moti Nagar, Hyderabad, Telangana 500018, Hyderabad, Telangana, 500018, Hyderabad, 500018; the RERA filing says ERRAGADDA. Developer site
The RERA filing is the legally binding record.

Sources & web results

Fallback
Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
BRIGADE CITADEL - PHASE 3
Developer / Promoter
Brigade Enterprises Limited
Project type
Residential
RERA Registration No.
P02200002548
Registration Status
New Project
Approved on
24/08/2020
Proposed completion
31/12/2025
Approving authority
GHMC
Plan approval no.
. 1/C19/08901/2020
Total site area
51,596 sq m (12.7 acres)
Approved built-up area
181,353 sq m (44.8 acres)
Buildings (approved plan)
2
Locality
ERRAGADDA
Mandal
Balanagar
District
Medchal-Malkajgiri
PIN code
500018
Documents on File
22

Other registrations of Brigade Citadel

Frequently asked questions

Is BRIGADE CITADEL - PHASE 3 registered with Telangana RERA?

Yes. BRIGADE CITADEL - PHASE 3 is registered with the Telangana Real Estate Regulatory Authority as P02200002548; the registration status is New Project.

Who is the developer of BRIGADE CITADEL - PHASE 3?

The promoter named in the RERA registration is Brigade Enterprises Limited.

Where is BRIGADE CITADEL - PHASE 3 located?

BRIGADE CITADEL - PHASE 3 is in ERRAGADDA, Balanagar, Medchal-Malkajgiri, Telangana (500018).

When will BRIGADE CITADEL - PHASE 3 be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2025. This is the promoter's declaration, not a guarantee.

More projects in Erragadda