Brigade Citadel - Phase 1
Brigade Citadel - Phase 1 is a residential project by Brigade Enterprises Limited in Erragadda, Balanagar, Medchal-Malkajgiri district, Telangana. It is registered with the Telangana RERA as P02200002237 (status: New Project). The approving authority named in the filing is GHMC (plan approval 1/C19/08901/2020). The promoter filed a total site area of 51,596 sq m (12.7 acres) and 3 buildings on the approved plan. The proposed date of completion is 30/09/2025.
Description
Brigade Citadel Phase 1 is a residential apartment project recorded as a New Project with TG-RERA. The filing lists 370 units across 2 towers, with 16 floors and a land area of 51,596.35 sq m; its proposed completion date is 30 September 2025.
- Project type
- Residential (apartment)RERA filing
- Units
- 370RERA filing
- Towers
- 2RERA filing
- Floors
- 16RERA filing
- Land area
- 51596.35 sq mRERA filing
- Possession
- 30/09/2025RERA filing
- Status
- New ProjectRERA filing
Configurations & sizes
The approved drawings show a measured carpet area of 31.5 sq m for a 1BHK; this is a drawing measurement, not a RERA disclosure, and should be verified against the drawing. The TG-RERA filing lists 172 2BHK units, 140 booked, with saleable area of 29.46 sq m, and 198 3BHK units, 172 booked, with saleable area of 43.44 sq m.
| Type | Carpet | Saleable | Facing | Source |
|---|---|---|---|---|
| 3BHK | 1,030 Sq.ft. | 43.44 sq m | RERA filing | |
| 2BHK | 758 Sq.ft. | 29.46 sq m | East | RERA filing |
| 2 Bedrooms + 2 Toilets | 758 Sq.ft. | 1,177 Sq.ft. | d1di04ifehjy6m.cloudfront | |
| 3 Bedrooms + 2 Toilets | 1,030 Sq.ft. | 1,583 Sq.ft. | d1di04ifehjy6m.cloudfront |
Amenities
The project’s disclosed amenities include recreational, fitness, community and utility facilities.
- Clubhouse · 53,000 sq.ft.
- Green Strip/TOT LOT/Park
- Community Buildings
- Sauna
- Spa
- Conference Room
- Business Center
- Car Parking
- Water Storage
- Security Gated Community
- Fire Fighting System
- 24x7 Security
- Electricity Meter Room
- Paved Compound
- yoga / meditation area
- steam room
- multipurpose room
- cycling & jogging track
- party lawn
- senior citizen siteout
- spa/sauna/steam
- cafeteria
- cricket pitch
- amphitheater
- aerobics room
- water sports
- clubhouse
- Amphitheatre
- Children's Play Area
- Cricket Practice Net
- Jogging Track
- Outdoor Gym
- Skating Rink
- Aerobics
- ATM
- AV Room
- Clinic
- Convenience Store
- Gym
- Indoor Games
- Party Hall
- Multipurpose Hall
- Pharmacy
- Physiotherapy
- Pool Table
- Swimming Pool/ Kids Pool
- Table Tennis
- Banyan Tree - Seating Area
- Seating Plaza
- Play Lawn
- Yoga and Meditation
- Salon
- Water feature
- Multipurpose lawn
- Flea/farmers’ market
- Feature wall
- Terrace pool
- Tot lot
- Pool at the 2nd floor terrace
- Flowers
- Jogging and Strolling Track
- Power Back Up
- Swimming Pool
- Lift
- Park
- Reserved Parking
- Service/Goods Lift
- Intercom Facility
- Maintenance Staff
- Banquet Hall
- indoor recreation
- multiple fitness amenities
- landscaped gardens
- open lawns
- cricket practice nets
- event facilities
- communal areas
- activity zones
- Piped Gas
- Waste Disposal
- Cricket net practice
- Event Space & Amphitheatre
- Garden
- Tennis
- Badminton
- Shopping Mall
- Parking
Specifications
- Basement Walls and Ceiling
- Cement Paint
- Bedroom Doors
- Hardwood frame, masonite skin shutter finished with PU paint and architrave
- Common area including lift lobby walls and ceiling
- Emulsion Paint
- compliance
- Vastu Compliant
- Counter
- Provision for Modular Kitchen
- CP Fittings
- Jaquar or equivalent
- DG Backup
- 3 kW for 3 BHK, 2 kW for 2 BHK
- entrance lobby
- Entrance Lobby
- Exterior Finish
- External texture paint in combination with external emulsion as per design.
- flooring
- vitrified tiles
- Flooring
- Anti-skid Ceramic Tiles
- Main Door
- Teakwood frame, flush shutter with both side veneer with teak finish and architrave
- Master Bedroom
- Wood Finish Vitrified Tiles
- Master Bedroom Toilet
- Ceramic Tiles
- Modular Switches
- Anchor Roma or equivalent make
- Plumbing / Electrical
- Plumbing point provision for water purifier/sink and washing machine
- Plumbing / Electrical
- Electrical point provision for Water Purifier, Refrigerator,Microwave, Washing Machine, Instant Geyser, Hob, Chimney and Mixer
- Power
- 2 BHK: 4 kW, 3 BHK: 6 kW
- Power backup
- 100% backup for emergency power of lifts, pumps and lighting in common area
- Sanitary Fixtures
- Jaquar/Parryware or equivalent (Wall mounted EWC with concealed cistern)
- security
- Intercom, Security Cabin, Fire Sprinklers, 24x7 Security, Gated Community, Fire Fighting System
- Security System
- Provision for intercom facility (Handset in customer scope)
- Staircase, utility area and service area walls and ceiling
- OBD
- Toilet Doors
- Hardwood frame, laminate finish shutter and architrave
- Unit Ceiling
- Acrylic Emulsion Paint
- Vertical Transportation
- Lifts provided as per design (OTIS/Fujitec/Schindler or equivalent)
- Windows
- UPVC/Aluminium with bug screen
Location & connectivity
The project is in Erragadda, Balanagar mandal, Medchal-Malkajgiri district, PIN 500018. The developer lists Erragadda Metro Station at 0.2 km, Bharath Nagar Metro Station at 0.5 km, a bus stop at 0.2 km, Begumpet Railway Station at 5 km and Secunderabad Railway Station at 10 km.
- Erragadda Metro Station0.2 km
- Bharath Nagar Metro Station0.5 km
- Bus Stop0.2 km
- Begumpet Railway Station5 km
- Secunderabad Railway Station10 km
Promoter
The promoter is Brigade Enterprises Limited, a company whose official website lists the project. TG-RERA records 7 other registered projects; the named architect is KAIVASAM PANDURANGA MURTHY and the structural engineer is ANANDHI G.
Additional details
- GHMC
- Project Permit Number - 2033/GHMC/SLP/2022-BP
Filed vs marketed
The TG-RERA filing records 370 total units, while the developer site markets 1,334; it records 2 towers, while Magicbricks lists 9, and the filing locality is ERRAGADDA while the developer site gives a longer address identifying Moti Nagar.
- Total units: The developer’s site says 1334; the RERA filing says 370. Developer site
- Towers: magicbricks says 9; the RERA filing says 2. magicbricks
- Land area: magicbricks says 11 Acre; we show 11.75 Acres. magicbricks
- Total units: magicbricks says 1124; we show 1334. magicbricks
- Locality: The developer’s site says Survey No :78 & 79, Meter Factory, Ashok Marg, Sultan Bagh, Moti Nagar, Hyderabad, Telangana 500018, Hyderabad, Telangana, 500018, Hyderabad, 500018; the RERA filing says ERRAGADDA. Developer site
Sources & web results
- Brigade Citadel in Moti Nagar, Hyderabadmagicbricks.com
- Brigade Citadel RERA Details - P02200002237, Hyderabadsquareyards.com
- Brigade Citadel Phase I in Moti Nagar, Hyderabadcommonfloor.com
- Brigade Citadel Phase 3 in Erragadda, Hyderabadhousing.com
- BRIGADE CITADEL - PHASE 1 Hyderabad – RERA No. ...aurumproptech.in
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- BRIGADE CITADEL - PHASE 1
- Developer / Promoter
- Brigade Enterprises Limited
- Project type
- Residential
- RERA Registration No.
- P02200002237
- Registration Status
- New Project
- Approved on
- 24/08/2020
- Proposed completion
- 30/09/2025
- Approving authority
- GHMC
- Plan approval no.
- 1/C19/08901/2020
- Total site area
- 51,596 sq m (12.7 acres)
- Approved built-up area
- 181,353 sq m (44.8 acres)
- Buildings (approved plan)
- 3
- Locality
- ERRAGADDA
- Mandal
- Balanagar
- District
- Medchal-Malkajgiri
- PIN code
- 500018
- Documents on File
- 29
Other registrations of Brigade Citadel
Frequently asked questions
Is BRIGADE CITADEL - PHASE 1 registered with Telangana RERA?
Yes. BRIGADE CITADEL - PHASE 1 is registered with the Telangana Real Estate Regulatory Authority as P02200002237; the registration status is New Project.
Who is the developer of BRIGADE CITADEL - PHASE 1?
The promoter named in the RERA registration is Brigade Enterprises Limited.
Where is BRIGADE CITADEL - PHASE 1 located?
BRIGADE CITADEL - PHASE 1 is in ERRAGADDA, Balanagar, Medchal-Malkajgiri, Telangana (500018).
When will BRIGADE CITADEL - PHASE 1 be completed?
The promoter's proposed date of completion filed with RERA is 30/09/2025. This is the promoter's declaration, not a guarantee.