thePropCheck AI property due diligence
Sign in

The Pearl- Phase - II

The Pearl- Phase - II is a residential project by Auro Realty Private Limited in Khanamet, Serlingampally, Serilingampally, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400006882 (status: New Project). The approving authority named in the filing is GHMC. The promoter filed a total site area of 101,198 sq m (25.0 acres) and 4 buildings on the approved plan. The proposed date of completion is 04/12/2028.

More from Auro Realty Pvt Ltd · 5 projects →

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

The Pearl Phase II is a residential apartment project with 190 units across 3 towers and 33 floors on 101,198.26 sq m of land. The TG-RERA filing lists its status as New Project and proposed completion as 04/12/2028.

Project type
Residential (apartment)RERA filing
Units
190RERA filing
Towers
3RERA filing
Floors
33RERA filing
Land area
101198.26 sq mRERA filing
Possession
04/12/2028RERA filing
Status
New ProjectRERA filing
Photo from nobroker.in
Photo from nobroker.in

Configurations & sizes

The approved-drawing carpet area has not been measured, so the carpet area is not disclosed here. The TG-RERA filing records 190 4BHK units, with 0 booked and a saleable area of 497.02 sq m; the developer-advertised carpet figure is 5,350 sqft, attributed to the developer and subject to verification.

TypeCarpetSaleableSource
4BHK5,350 sqft497.02 sq mRERA filing

Amenities

The developer lists a range of amenities, including a clubhouse, fitness and recreation facilities, and building services.

31 amenities · 29 listed
  • Waste Disposal
  • Conference Room
  • Health club with Steam / Jaccuzi
  • Entry Exit Gate
  • Concierge Services
  • Barbeque space
  • Club House
  • Bar/Lounge
  • Jogging and Strolling Track
  • Power Back Up
  • Swimming Pool
  • Lift
  • Security
  • Park
  • Reserved Parking
  • Service/Goods Lift
  • Intercom Facility
  • Maintenance Staff
  • Banquet Hall
  • Gymnasium
  • Laundry Service
  • Piped Gas
  • RO Water System
  • Air Conditioned
  • Vaastu Compliant
  • Internet/Wi-Fi Connectivity
  • Fingerprint Access
  • Smart Home
  • Pet park

Specifications

air conditioning
Advanced and energy efficient VRV/VRF system in every Sky Mansions
balconies and decks
Well thought out anti-skid vitrified tiles of reputed make in balconies & decks
balcony dado
Dado of high-quality vitrified tiles up to sill level
balcony railings
Aesthetically designed laminated glass balcony railings with stainless-steel rails
building management
BMS for electricity & gas consumption with prepaid / post-paid
cellular signal
Cellular signal with booster at terrace to cover entire building
electrical
Reputed make MCB, Modular Switches & 3-phase supply with Prepaid / Post-paid meters
entrance door
Grand welcome to the residence with 8-feet teak wood door with reputed make hardware & engineered wood for internal doors
EV charging
Common EV charging stations for resident car parking
exterior paint
Superior quality exterior paints for walls & ceiling
false ceiling
False Ceiling in living, dinning, and all bedrooms (extent as per design)
fire safety
Fully loaded firefighting & public addressing system
home automation
Home Automation system integrating lighting (On/Off), video doorbells & gas leak detection
intercom
Intercom connects living & master bedrooms seamlessly
intercom
Intercom connects security rooms for emergency situations
internet
Wifi provisions for each flat in living room
internet and cable TV
Provision for Internet & cable TV
kitchen
Premium modular kitchen with water purifiers
kitchen
Dry & wet kitchen segregation for functionality & showing-off
kitchen flooring and surfaces
Marble finish flooring, countertops, and backsplashes
lift lobbies
air conditioned lift lobbies
lighting
Energy efficient LED light fixtures for all shared areas
lobby air conditioning
Advance and energy efficient air-conditioning system in entrance lobby
power backup
100 % DG backup with auto change over
sanitaryware and fittings
Reputed make sanitaryware, health faucet, wash basin & single lever CP fittings
security
24×7 CCTV surveillance & security staff in lobbies, basements & entrances
service elevator
Optimum-sized service elevator for staff & goods movement
sit-out doors
Enjoy your sit-out fitted with aluminum French doors with energy efficient glass panels & provision of mosquito-net track
stairs
MS railings with restile/granite flooring for stairs
toilets
Shower partition of reputed make with wall hung EWC in all toilets
unit flooring
Marble flooring in living, dining, all bedrooms & toilets with acrylic emulsion paint finish on walls & ceiling
utility doors
Aluminum frames of reputed make with combination of glass & laminated MDF for utility doors
utility flooring
Utility with antiskid & anti-microbial flooring
vanity counter
Marble finish vanity counter & reputed make wash basin with monolithic counter
windows
Reputed make aluminum window frames, energy efficient glass sliding panes & provision of mosquito track

Location & connectivity

The project is in Khanamet, Serilingampally, Ranga Reddy district. Nearby locations listed by the developer include Hitex Exhibition Center (1.3 Km), Cyber Tower Metro Station (2.4 Km), Botanical Garden (3.6 Km), and Yashoda Hospitals (0.5 Km).

Kannamet, Serilingampally, Ranga Reddy
📍 Open in Maps
Nearby
  • Hitex Exhibition Center1.3 Km
  • Cyber Tower Metro Station2.4 Km
  • Airport33.7 Km
  • Botanical Garden3.6 Km
  • School5.1 Km
  • Delhi Public School9.1 Km
  • Meridian School2.2 Km
  • Trident Hotel2.9 Km
  • Novotel Hotel1.3 Km
  • Image Hospital4.2 Km
  • Yashoda Hospitals0.5 Km
  • Forum Sujana Mall3.4 Km

Promoter

The promoter is AURO REALTY PRIVATE LIMITED, a private limited company, with 4 other registered projects. Its official website is https://aurorealty.com/residential-projects/the-pearl; the filing names NUNNA VENKATESH as architect and ROHAN ASHOK YAWLKAR as structural engineer.

AURO REALTY PRIVATE LIMITED
4 other projects on record
Official website ›Developer site

Additional details

Launched 01 May 2024magicbricks

Filed vs marketed

The TG-RERA filing records 190 units and 3 towers, while the developer's marketing lists 224 units and 12 towers; the filing locality is KHANAMET, SERLINGAMPALLY, while the marketing gives a different location description.

  • Total units: magicbricks says 224 units; the RERA filing says 190. magicbricks
  • Towers: magicbricks says 12; the RERA filing says 3. magicbricks
  • Locality: magicbricks says Plot No. 1&2, comprising in Survey No. 41/14, Near HITEC City MMTS Station, R. R. District, Hyderabad. 500081; the RERA filing says KHANAMET, SERLINGAMPALLY. magicbricks
The RERA filing is the legally binding record.

Sources & web results

Fallback
Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
THE PEARL- PHASE - II
Developer / Promoter
AURO REALTY PRIVATE LIMITED
Project type
Residential
RERA Registration No.
P02400006882
Registration Status
New Project
Approved on
04/08/2022
Proposed completion
04/12/2028
Approving authority
GHMC
Total site area
101,198 sq m (25.0 acres)
Approved built-up area
310,620 sq m (76.8 acres)
Buildings (approved plan)
4
Locality
KHANAMET, SERLINGAMPALLY, Kannamet
Mandal
Serilingampally
District
Rangareddy
PIN code
500084
Documents on File
41

Other registrations of The Pearl

Frequently asked questions

Is THE PEARL- PHASE - II registered with Telangana RERA?

Yes. THE PEARL- PHASE - II is registered with the Telangana Real Estate Regulatory Authority as P02400006882; the registration status is New Project.

Who is the developer of THE PEARL- PHASE - II?

The promoter named in the RERA registration is AURO REALTY PRIVATE LIMITED.

Where is THE PEARL- PHASE - II located?

THE PEARL- PHASE - II is in KHANAMET, SERLINGAMPALLY, Kannamet, Serilingampally, Rangareddy, Telangana (500084).

When will THE PEARL- PHASE - II be completed?

The promoter's proposed date of completion filed with RERA is 04/12/2028. This is the promoter's declaration, not a guarantee.

More projects in Kannamet