thePropCheck AI property due diligence
Sign in

Suryodaya Abode Block B

Suryodaya Abode Block B is a residential project by Sipil Infra Private Limited in Khanamet, Serilingampally, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400007377 (status: New Project). The approving authority named in the filing is GHMC. The promoter filed a total site area of 683 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 30/11/2026.

More from Sipil Infra Pvt Ltd · 3 projects →

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

Suryodaya Abode Block B is a residential apartment project recorded as a new project with TG-RERA. The filing records 10 homes in one tower over five floors, on 683.13 sq m of land, with proposed completion on 30/11/2026.

Project type
Residential (apartment)RERA filing
Units
10RERA filing
Towers
1RERA filing
Floors
5RERA filing
Land area
683.13 sq mRERA filing
Possession
30/11/2026RERA filing
Status
New ProjectRERA filing
Photo from nobroker.in

Configurations & sizes

The 3BHK carpet area measures 118.5–134.9 sq m in the approved floor-plan drawings (median 134.8 sq m); this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawing. The TG-RERA filing records 10 such units, 3 booked, and a saleable area of 222.12 sq m.

TypeCarpetSaleableSource
3BHK2,391 sqft222.12 sq mRERA filing

Amenities

The listed amenities include recreation, building services, security and sustainability features.

24 amenities
  • Green Strip/TOT LOT/Park
  • 24Hrs Backup Electricity
  • Vastu / Feng Shui compliant
  • Garden
  • Maintenance Staff
  • Power Backup
  • Elevator
  • Car Parking
  • CCTV
  • Jogging Track
  • 24-hour backup electricity
  • compound
  • entrance gate with security cabin
  • gated community
  • landscaped garden
  • lawn
  • seating area
  • security personnel
  • waste management
  • natural ventilation
  • eco-friendly roofing
  • electric vehicle charging stations
  • Entry Exit Gate
  • Fire Fighting Equipment

Specifications

Project Status
Under Construction / Ready to Move

Location & connectivity

The project is in Khanamet, Serilingampally, Ranga Reddy district, at Izzath Nagar, Hyderabad. Hitech City Railway Station is listed at 0.6 Km.

Khanamet, Serilingampally, Ranga Reddy
📍 Open in Maps
Nearby
  • Hitech City Railway Station0.6 Km

Promoter

The promoter is SIPIL INFRA PRIVATE LIMITED, a private limited company with 2 other registered projects. The named architect is Venkatesh Ramarum and the structural engineer is R Sambasiva Rao.

SIPIL INFRA PRIVATE LIMITED
2 other projects on record

Additional details

Launched 01 June 2023magicbricks

Sources & web results

Fallback
Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
SURYODAYA ABODE BLOCK B
Developer / Promoter
SIPIL INFRA PRIVATE LIMITED
Project type
Residential
RERA Registration No.
P02400007377
Registration Status
New Project
Approved on
01/06/2023
Proposed completion
30/11/2026
Approving authority
GHMC
Total site area
683 sq m (0.2 acres)
Approved built-up area
1,681 sq m (0.4 acres)
Buildings (approved plan)
1
Locality
Khanamet
Mandal
Serilingampally
District
Rangareddy
PIN code
500084
Documents on File
13

Other registrations of Suryodaya Abode

Frequently asked questions

Is SURYODAYA ABODE BLOCK B registered with Telangana RERA?

Yes. SURYODAYA ABODE BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P02400007377; the registration status is New Project.

Who is the developer of SURYODAYA ABODE BLOCK B?

The promoter named in the RERA registration is SIPIL INFRA PRIVATE LIMITED.

Where is SURYODAYA ABODE BLOCK B located?

SURYODAYA ABODE BLOCK B is in Khanamet, Serilingampally, Rangareddy, Telangana (500084).

When will SURYODAYA ABODE BLOCK B be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Kannamet