Bhuvi
Bhuvi is a residential project by Bonsai MNP Housing in beside Indur college of Engineering, Siddipet district, Telangana. It is registered with the Telangana RERA as P01300000331 (status: New Project). The promoter filed a total site area of 19,847 sq m (4.9 acres) and 71 buildings on the approved plan. The proposed date of completion is 01/07/2022.
Description
BHUVI is a residential villa project registered with TG-RERA as a new project. The filing records 73 units across 71 villa-named blocks on 19,846.70 sq m of land, with a proposed completion date of 1 July 2022.
- Project type
- Residential (villa)RERA filing
- Units
- 73RERA filing
- Land area
- 19846.70 sq mRERA filing
- Possession
- 01/07/2022RERA filing
- Status
- New ProjectRERA filing
Configurations & sizes
The approved floor-plan drawings were measured for 3BHK carpet areas of 82.3–87.7 sq m; this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawings. TG-RERA records a Villa configuration with 73 units, 0 booked, and a saleable area of 190.45 sq m; the developer's third-party listing describes a 3 BHK villa and claims a saleable area of 2,050 sq ft.
| Type | Built-up | Saleable | Source |
|---|---|---|---|
| Villa | 190.45 sq m | RERA filing | |
| 3 BHK Villa | 2050 sq.ft | commonfloor | |
| Residential | 19846.70 sqmts | 99acres |
Amenities
The disclosed amenities include community open space and landscaped areas, security-related features, and common infrastructure.
- Green Strip/TOT LOT/Park
- Aggregate area of recreational Open Space
- CCTV Cameras
- Compound
- Covered Car Parking
- Entrance Gate With Security Cabin
- Gated Community
- Landscaped Garden
- Security Personnel
- Indoor 24Hrs Backup Electricity
- Vastu / Feng Shui compliant
Location & connectivity
The project is beside Indur College of Engineering in Siddipet district, PIN 502103. It is on Ponnala to Siddipet Road, near Indur College of Engineering.
Promoter
The promoter is Bonsai MNP Housing, a partnership. It has one other registered project; the filing names S. Neelsh Kumar as architect and MVV Satyanarayana as structural engineer.
Additional details
Filed vs marketed
The developer's marketing lists 72 units and 72 villas, while the RERA filing lists 73; the marketing states possession as Jul-2021 versus the filing's proposed completion date of 01/07/2022, and gives the locality as Siddipet, Medak, Telangana, India rather than beside Indur College of Engineering.
- Total units: commonfloor says 72 Units; the RERA filing says 73. commonfloor
- Total villas: commonfloor says 72 luxurious villas; the RERA filing says 73. commonfloor
- Possession: commonfloor says Jul-2021; the RERA filing says 01/07/2022. commonfloor
- Locality: commonfloor says Siddipet, Medak, Telangana, INDIA; the RERA filing says beside Indur college of Engineering. commonfloor
Sources & web results
- BHUVI | | Ponnal | Photos & Reviewsbhumiboss.com
- Bonsai Bhuvi FAQs - Projects in Siddipet District99acres.com
- BHUVI Hyderabad – RERA No. P01300000331aurumproptech.in
- quikr.com
- Bonsai Bhuvi Location & Neighbourhoodnobroker.in
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- BHUVI
- Developer / Promoter
- Bonsai MNP Housing
- Project type
- Residential
- RERA Registration No.
- P01300000331
- Registration Status
- New Project
- Approved on
- 21/05/2018
- Proposed completion
- 01/07/2022
- Total site area
- 19,847 sq m (4.9 acres)
- Approved built-up area
- 19,847 sq m (4.9 acres)
- Buildings (approved plan)
- 71
- Locality
- beside Indur college of Engineering
- District
- Siddipet
- PIN code
- 502103
- Documents on File
- 25
Frequently asked questions
Is BHUVI registered with Telangana RERA?
Yes. BHUVI is registered with the Telangana Real Estate Regulatory Authority as P01300000331; the registration status is New Project.
Who is the developer of BHUVI?
The promoter named in the RERA registration is Bonsai MNP Housing.
Where is BHUVI located?
BHUVI is in beside Indur college of Engineering, Siddipet, Telangana (502103).
When will BHUVI be completed?
The promoter's proposed date of completion filed with RERA is 01/07/2022. This is the promoter's declaration, not a guarantee.