Silver Spring Phase 5

Silver Spring Phase 5 is a plotted development project by Shathabdhi Townships PVT LTD in Kothapet, Keshampet, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400002946 (status: New Project). The approving authority named in the filing is DTCP (plan approval 216/2019/H). The promoter filed a total site area of 80,371 sq m (19.9 acres). The proposed date of completion is 30/09/2025.

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

Silver Spring Phase 5 is a plotted development with a RERA-filed land area of 80,370.56 sq m. TG-RERA records the project as new, with a proposed completion date of 30 September 2025.

Project type
Plotted DevelopmentRERA filing
Land area
80370.56 sq mRERA filing
Possession
30/09/2025RERA filing
Status
New ProjectRERA filing

Configurations & sizes

The developer’s listed configurations include 3 and 4 BHK homes and plots; the plot listing advertises built-up areas of 1,319–6,465 sq ft. The approved drawings are scans pending measurement, so a measured carpet area is not available; TG-RERA unit, booking and saleable-area figures are not disclosed.

TypeBuilt-upSource
3 & 4 BHKhousing
Plot1,319 - 6,465 sq fthousing

Amenities

The disclosed amenities and infrastructure cover open and landscaped spaces, utilities, roads and drainage, and safety systems.

15 amenities
  • Green Strip/TOT LOT/Park
  • Aggregate area of recreational Open Space
  • Fire Fighting System
  • Aggregate area of recreational
  • Open Space
  • Meter Room
  • Water Harvesting Pits
  • Over head tank for supply of water
  • Resorts with Ultra Modern facilities
  • 100% Reply
  • Electricity
  • Park with Children play area
  • Excellent landscaping
  • Avenue plantation with designer tiles
  • Round the clock security

Location & connectivity

The RERA filing places the project in Kothapet, Keshampet mandal, Ranga Reddy district, PIN 503053. The developer markets the location as Alwal near Mangalgudem, Maheshwaram.

Kothapet, Keshampet, Ranga Reddy
📍 Open in Maps

Promoter

The promoter is SHATHABDHI TOWNSHIPS PVT LTD, a private limited company, with 19 other registered projects. Its official website is shathabdhitownships.com; the filing names K.VISHNU DATTU as architect and k pramod kumar as structural engineer.

SHATHABDHI TOWNSHIPS PVT LTD
19 other projects on record
Official website ›Developer site

Additional details

Filed vs marketed

The RERA filing lists the locality as KOTHAPET, while the developer’s site markets it as Alwal near Mangalgudem, Maheshwaram.

  • Locality: The developer’s site says Alwal near Mangalgudem, Maheshwaram; the RERA filing says KOTHAPET. Developer site
The RERA filing is the legally binding record.

Sources & web results

Fallback
Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
SILVER SPRING PHASE 5
Developer / Promoter
SHATHABDHI TOWNSHIPS PVT LTD
Project type
Plotted Development
RERA Registration No.
P02400002946
Registration Status
New Project
Approved on
30/09/2019
Proposed completion
30/09/2025
Approving authority
DTCP
Plan approval no.
216/2019/H
Total site area
80,371 sq m (19.9 acres)
Approved built-up area
46,996 sq m (11.6 acres)
Locality
KOTHAPET, Kothapet
Mandal
Keshampet
District
Rangareddy
PIN code
503053
Documents on File
13

Other registrations of Silver Spring

Frequently asked questions

Is SILVER SPRING PHASE 5 registered with Telangana RERA?

Yes. SILVER SPRING PHASE 5 is registered with the Telangana Real Estate Regulatory Authority as P02400002946; the registration status is New Project.

Who is the developer of SILVER SPRING PHASE 5?

The promoter named in the RERA registration is SHATHABDHI TOWNSHIPS PVT LTD.

Where is SILVER SPRING PHASE 5 located?

SILVER SPRING PHASE 5 is in KOTHAPET, Keshampet, Rangareddy, Telangana (503053).

When will SILVER SPRING PHASE 5 be completed?

The promoter's proposed date of completion filed with RERA is 30/09/2025. This is the promoter's declaration, not a guarantee.