Manjunatha Tower Two
Manjunatha Tower Two is a residential project by Sree Manjunatha Constructions in Khanameta, Rangareddy district, Telangana. It is registered with the Telangana RERA as P02400002649 (status: On-Going Project). The approving authority named in the filing is GHMC (plan approval 2/C21/04686/2020). The promoter filed a total site area of 933 sq m (0.2 acres) and 1 building on the approved plan. The proposed date of completion is 31/12/2025.
More from Sree Manjunatha Constructions · 2 projects →
Description
Manjunatha Tower Two is a residential apartment project in Khanameta, Ranga Reddy, with 20 units in one tower across five floors on 932.7 sq m of land. It is listed as an ongoing project in the TG-RERA filing, with completion proposed for 31 December 2025.
- Project type
- Residential (apartment)RERA filing
- Units
- 20RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 932.7 sq mRERA filing
- Possession
- 31/12/2025RERA filing
- Status
- On-Going ProjectRERA filing
Configurations & sizes
For the 3BHK configuration, carpet area measured from the approved floor-plan drawings ranges from 79.8 to 133.5 sq m (median 98.1 sq m); this is a drawing measurement, not a RERA disclosure, and should be verified against the drawings. The TG-RERA filing records 20 units, 0 booked, and saleable area of 137.8 sq m.
| Type | Saleable | Source |
|---|---|---|
| 3BHK | 137.8 sq m | RERA filing |
Amenities
The disclosed amenities and infrastructure include water supply, rainwater harvesting, parking, security and fire-safety provisions.
- lush green spaces
- recreational facilities
- CCTV Cameras
- Compound
- Covered Car Parking
- Entrance Gate With Security Cabin
- Gated Community
- Lift
- Security Personnel
- Indoor Fire Alarm
- Closed Car Parking
- Meter Room
Location & connectivity
The project is in Khanameta, Ranga Reddy district, PIN 500084.
Promoter
The promoter is SREE MANJUNATHA CONSTRUCTIONS, a partnership. The promoter has one other registered project; the named architect is T V SRINIVAS and the structural engineer is NAGARJUNA.
Additional details
- GHMC
- Government Approval: GHMC
Filed vs marketed
The TG-RERA filing lists the locality as KHANAMETA, while Commonfloor describes it as “Khanamet, Hyderabad, Telangana, INDIA.”
- Possession: proptiger says Dec'25; we show Aug-2025 (Ready-to-move). proptiger
- Locality: commonfloor says Khanamet, Hyderabad, Telangana, INDIA.; the RERA filing says KHANAMETA. commonfloor
Sources & web results
- Manjunatha Tower Two in Khanamet, Hyderabadcommonfloor.com
- Sreee Tower Two Phase 1 in Hitech City, Hyderabadproptiger.com
- Manjunatha Tower Two Apartment for Sale in Khanamet, ...gharpe.com
- MANJUNATHA TOWER TWO | 3BHK | Khanammetbhumiboss.com
- Manjunatha Tower Two Apartment for Sale in Khanamet, ...gharpe.com
- MANJUNATHA TOWER TWO Medchal-Malkajgiriaurumproptech.in
- Manjunatha Tower Two in Hyderabad - QuikrHomesquikr.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- MANJUNATHA TOWER TWO
- Developer / Promoter
- SREE MANJUNATHA CONSTRUCTIONS
- Project type
- Residential
- RERA Registration No.
- P02400002649
- Registration Status
- On-Going Project
- Approved on
- 12/05/2020
- Proposed completion
- 31/12/2025
- Approving authority
- GHMC
- Plan approval no.
- 2/C21/04686/2020
- Total site area
- 933 sq m (0.2 acres)
- Approved built-up area
- 2,284 sq m (0.6 acres)
- Buildings (approved plan)
- 1
- Locality
- KHANAMETA
- District
- Rangareddy
- PIN code
- 500084
- Documents on File
- 11
Other registrations of Manjunatha
Frequently asked questions
Is MANJUNATHA TOWER TWO registered with Telangana RERA?
Yes. MANJUNATHA TOWER TWO is registered with the Telangana Real Estate Regulatory Authority as P02400002649; the registration status is On-Going Project.
Who is the developer of MANJUNATHA TOWER TWO?
The promoter named in the RERA registration is SREE MANJUNATHA CONSTRUCTIONS.
Where is MANJUNATHA TOWER TWO located?
MANJUNATHA TOWER TWO is in KHANAMETA, Rangareddy, Telangana (500084).
When will MANJUNATHA TOWER TWO be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2025. This is the promoter's declaration, not a guarantee.