Northeast Residency
Northeast Residency is a residential project by Northeast Estates in Nagole, Uppal, Medchal-Malkajgiri district, Telangana. It is registered with the Telangana RERA as P02200000560 (status: New Project). The approving authority named in the filing is GHMC (plan approval 1/C3/01018/2019). The promoter filed a total site area of 1,210 sq m (0.3 acres) and 1 building on the approved plan. The proposed date of completion is 01/01/2025.
Description
Northeast Residency is a residential apartment project filed as a New Project with TG-RERA. The filing records 25 homes in one tower across five floors, on 1209.81 sq m of land, with proposed completion on 1 January 2025.
- Project type
- Residential (apartment)RERA filing
- Units
- 25RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 1209.81 sq mRERA filing
- Possession
- 01/01/2025RERA filing
- Status
- New ProjectRERA filing
Gallery

Configurations & sizes
The approved drawings measure 2BHK carpet areas from 48.2 to 77.4 sq m (median 61.1 sq m); this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawings. The filing records 10 2BHK homes, none booked, with saleable area of 82.86 sq m, and 3BHK carpet areas measured from the drawings at 79.1 to 93.7 sq m (median 87.5 sq m); this is not a RERA disclosure and should be verified against the drawings. The filing records 15 3BHK homes, none booked, with saleable area of 138.17 sq m; the developer separately advertises a 3BHK built-up area of 1441 sq ft.
| Type | Built-up | Saleable | Source |
|---|---|---|---|
| 3BHK | 1441 sq.ft | 138.17 sq m | RERA filing |
| 2BHK | 82.86 sq m | RERA filing |
Amenities
The listed facilities combine shared leisure amenities with project infrastructure, including water supply and sewerage.
- Green Strip/TOT LOT/Park
- clubhouse
- swimming pool
- gym
- indoor games
- landscaped gardens
- dedicated children’s zones
Specifications
- flooring
- vitrified tiles
Location & connectivity
The project is in Nagole, East Hyderabad, in Bandlaguda village, Uppal mandal, Medchal-Malkajgiri district. The developer lists Kennedy High School at 0.17 km, Supraja Hospitals at 2.1 km and Nagole Metro Station at 3.06 km.
- Kennedy High School0.17 km
- Supraja Hospitals2.1 km
- Nagole Metro Station3.06 km
Promoter
The promoter is NORTHEAST ESTATES; its entity type, count of other registered projects and official website are not disclosed. The filing names G TIMURTHY as architect and ZAKI & ASSOCIATES as structural engineer.
Sources & web results
- Northeast Residency Nagole, Hyderabad99acres.com
- NORTHEAST RESIDENCY Hyderabad – RERA No. ...aurumproptech.in
- Flats & Apartments for Sale in NORTHEAST RESIDENCY, ...nobroker.in
- Northeast Residency Nagole, East Hyderabad, Hyderabadbigestate.io
- Northeast Residency - Hyderabadgharpe.com
- Northeast Residency Nagole, Hyderabad - QuikrHomesquikr.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- NORTHEAST RESIDENCY
- Developer / Promoter
- NORTHEAST ESTATES
- Project type
- Residential
- RERA Registration No.
- P02200000560
- Registration Status
- New Project
- Approved on
- 18/01/2019
- Proposed completion
- 01/01/2025
- Approving authority
- GHMC
- Plan approval no.
- 1/C3/01018/2019
- Total site area
- 1,210 sq m (0.3 acres)
- Approved built-up area
- 4,726 sq m (1.2 acres)
- Buildings (approved plan)
- 1
- Locality
- NAGOLE, Bandlaguda
- Mandal
- Uppal
- District
- Medchal-Malkajgiri
- PIN code
- 500068
- Documents on File
- 12
Frequently asked questions
Is NORTHEAST RESIDENCY registered with Telangana RERA?
Yes. NORTHEAST RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200000560; the registration status is New Project.
Who is the developer of NORTHEAST RESIDENCY?
The promoter named in the RERA registration is NORTHEAST ESTATES.
Where is NORTHEAST RESIDENCY located?
NORTHEAST RESIDENCY is in NAGOLE, Bandlaguda, Uppal, Medchal-Malkajgiri, Telangana (500068).
When will NORTHEAST RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 01/01/2025. This is the promoter's declaration, not a guarantee.